Title: Public Hearing - Zoning Request Z15-011 - Rezoning from R-15 to RAD-Conditional for the construction of three new single-family homes - 0.668 Acres - Land Lot 560 - 1498 Walker Street - Georgian Fine Properties, LLC
Sponsors: Ron Fennel
Attachments: 1. Zoning Vicinity Map_Z15-011, 2. Land Use Vicinity Map_Z15-011, 3. Staff Memo_Z15-011, 4. Proposed Site Plan_Z15-011, 5. Zoning Application_Z15-011, 6. Proposed Site Plan_V.2_Z15-011, 7. Tree Protection Plan)_Z15-011, 8. Building Elevations & Floor Plan_Z15-011, 9. Survey Revision Explanation_Z15-011, 10. Arborist Letter_Z15-011, 11. Correspondence_Z15-011
Impact
WARD: 3

COMMITTEE: Community Development

$ IMPACT: N/A

Title
Public Hearing - Zoning Request Z15-011 - Rezoning from R-15 to RAD-Conditional for the construction of three new single-family homes - 0.668 Acres - Land Lot 560 - 1498 Walker Street - Georgian Fine Properties, LLC

Body
ISSUE: Georgian Fine Properties, LLC is requesting the rezoning for 1498 Walker Street from R-15 to RAD-Conditional for the construction of three new single-family homes at a density of 4.49 units per acre.

BACKGROUND: None.

RECOMMENDATION/REQUESTED ACTION: Community Development recommends approval of the request rezoning from R-15 to RAD-Conditional for the construction of three new single-family residences at a density of 4.49 units per acre with the following conditions:

Standard Conditions
(Requirement #2, 3, 4, 8, 9, 10 and 17 from Section 1201 of the Zoning Code is not applicable)

1. The composition of the homes in a residential subdivision shall include a mixture of elements including; but not limited to: brick, stone, shake, hardy plank and stucco. No elevation shall be comprised of 100% hardy plank siding. The residences whose lots abut external roadways shall not be permitted to utilize hardy plank for any elevation facing these roads.

2. The detention pond shall be placed and screened appropriately to be unobtrusive to homes inside and outside the development. The storm water detention plan shall be designed to create at least a 10% reduction in a 2-year to 100-year storm event. The City Engineer shall approve all plans.

3. All utilities within the development shall be underground.

4. The developer shall be responsible for any traffic improvements (including additional right-of-way dedications) deemed necessary by either the City or the County during construction plan review. Sidewalks shall be provided by the developer inside the subdivision and outside the subdivision adjacent to any public right-of-way consistent with City’s requirements ...

Click here for full text