Title: Public Hearing - Zoning Request Z14-013 - Rezoning from R-15 to RAD-Conditional for the construction of two new single-family homes - 0.46 Acre Tract - Land Lot 489 - 1084 Fleming Street - Jasper Wayne Proctor
Sponsors: Teri Anulewicz
Attachments: 1. Staff Memo_Z14-013, 2. Zoning Vicinity Map_Z14-013, 3. Land Usse Vicinity Map_Z14-013, 4. Rezoning Applicaitons_Z14-013, 5. Proposed Site Plan_Z14-013, 6. Tree Protection Plan Z14_013, 7. Bldg Elevations & Floor Plans_Z14-013, 8. Legal Description_Z14-013, 9. Correspondence _Z14-013, 10. Tree Assessment Report_Z14-013, 11. Water & Sewer Letter_Z14-013
Impact
WARD: 3

COMMITTEE: Community Development

$ IMPACT: N/A

Title
Public Hearing - Zoning Request Z14-013 - Rezoning from R-15 to RAD-Conditional for the construction of two new single-family homes - 0.46 Acre Tract - Land Lot 489 - 1084 Fleming Street - Jasper Wayne Proctor


Body
ISSUE: Jasper Wayne Proctor is proposing the demolition of the existing home and the development of two new detached single-family residences. The density for the site will be 4.35 units per acre. No land use change from Moderate Density Residential will be required for this rezoning.

BACKGROUND: None.

RECOMMENDATION/REQUESTED ACTION: Community Development recommends approval of the request rezoning from R-15 to RAD-Conditional for the construction of two new single-family residences at a density of 4.35 units per acre with the following conditions:

Standard Conditions
(Requirement #2, 3, 4, 8, 9, 10 and 17 from Section 1201 of the Zoning Code is not applicable)

1. The composition of the homes in a residential subdivision shall include a mixture of elements including; but not limited to: brick, stone, shake, hardy plank and stucco. No elevation shall be comprised of 100% hardy plank siding. The residences whose lots abut external roadways shall not be permitted to utilize hardy plank for any elevation facing these roads.

2. The stormwater management facility shall be placed and screened appropriately to be unobtrusive to homes inside and outside the development. The storm water detention plan shall be designed to create at least a 10% reduction in a 2-year to 100-year storm event. The City Engineer shall approve all plans.

3. All utilities within the development shall be underground.

4. The developer shall be responsible for any traffic improvements (including additional right-of-way dedications) deemed necessary by either the City or the County during construction plan review. Sidewalks shall be provided by the developer inside the subdivision and o...