File #: 2016-469    Version: 1 Name: Zoning Request Z16-020
Type: Authorization Status: Passed
File created: 11/10/2016 In control: City Council
On agenda: 12/19/2016 Final action: 12/19/2016
Title: Public Hearing - Zoning Request Z16-020 - Rezoning from FC to GC-Conditional for the development of a 5,500 sq. ft. commercial building - 0.535 Acres - Land Lot 523 - 1270 Concord Road - Super Tax, Inc.
Sponsors: Doug Stoner
Attachments: 1. IssueSheet 2016-469.pdf, 2. Z16-020_Staff Memo_V.2, 3. Zoning Vicinity Map_Z16-020, 4. Land Use Vicinity Map_Z16-020, 5. Rezoning Application_Z16-020, 6. Site Plan_Z16-020, 7. Tree Plan_Z16-020, 8. Building Elevation_V.2_Z16-020, 9. Floor Plan_Z16-020, 10. Water & Sewer Letter_Z16-020
Impact
WARD: 6

COMMITTEE: Community Development

$ IMPACT: N/A

Title
Public Hearing - Zoning Request Z16-020 - Rezoning from FC to GC-Conditional for the development of a 5,500 sq. ft. commercial building - 0.535 Acres - Land Lot 523 - 1270 Concord Road - Super Tax, Inc.

Body
ISSUE: Super Tax, Inc. is requesting to rezone the property from Future Commercial (FC) to General Commercial (GC)-Conditional for the development of a two-story, 5,500 sq. ft. commercial building.

BACKGROUND: The Planning and Zoning Board heard the rezoning request at the November 14, 2016 meeting and recommended approval of the rezoning from FC to LC-Conditional with staff conditions by vote of 7-0.

RECOMMENDATION/REQUESTED ACTION: Community Development recommends approval rezoning the subject property from FC to LC-Conditional for the development of a 5,500 sq. ft. commercial building with the following conditions:

Standard Conditions
(Requirement #1, 2, 3, 4, 8, 9, 10, 12,16 and 17 from Section 1201 of the Zoning Code is not applicable)

1. The stormwater management facility shall be placed and screened appropriately to be unobtrusive to homes inside and outside the development. The storm water detention plan shall be designed to create at least a 10% reduction in a 2-year to 100-year storm event. The City Engineer shall approve all plans.

2. All utilities within the development shall be underground.

3. The developer shall be responsible for any traffic improvements (including additional right-of-way dedication) deemed necessary by either the City or the County during construction plan review. Sidewalks shall be provided by the developer inside the subdivision and outside the subdivision adjacent to any public right-of-way consistent with City’s requirements for the extent of the development. A grass buffer with a minimum width of 2’ shall be ...