File #: 2018-511    Version: Name: Zoning Request Z18-019
Type: Authorization Status: Passed
File created: 12/5/2018 In control: City Council
On agenda: 1/22/2019 Final action: 1/22/2019
Title: Public Hearing - Zoning Request Z18-019 - Rezoning from OI to TS-Conditional for the construction of a new hotel - 0.99 Acres - Land Lot 881 - 2875 Spring Hill Parkway - MCP III Real Estate, LLC
Sponsors: Derek Norton
Attachments: 1. Issue Sheet, 2. Saff Memo_V.2_Z18-019.pdf, 3. Zoning Vicinity Map_Z18-019.pdf, 4. Land Use Vicinity Map_Z18-019.pdf, 5. Rezoning Application_Z18-019.pdf, 6. Existing Survey_Z18-019.pdf, 7. Site Plan_Z18-019.pdf, 8. Tree Plan_Z18-019.pdf, 9. Building Elevations_Z18-019.pdf, 10. Building Rendering_Z18-019.pdf, 11. Garvis Sams Letter_12042018_Z18-019.pdf, 12. Garvis Sams Letter_12102018_Z18-019.pdf, 13. Legal Ad_Z18-019.pdf

Impact

WARD:  1

 

COMMITTEE:  Community Development

 

$ IMPACT:  N/A

 

Title

Public Hearing - Zoning Request Z18-019 - Rezoning from OI to TS-Conditional for the construction of a new hotel - 0.99 Acres - Land Lot 881 - 2875 Spring Hill Parkway - MCP III Real Estate, LLC

Body

ISSUE: MCP III Real Estate, LLC is requesting to rezone the property at 2875 Spring Hill Parkway from Office/Institutional (OI) to Tourist Services (TS) - Conditional for the development of a seven-story, 136 room boutique hotel with structured parking.

 

The applicant is proposing to demolish the existing one-story office/warehouse building to construct a seven-story, 136 room hotel over a two-story structured parking deck. The site will be accessed from a full access driveway off Spring Hill Parkway on to the top deck of the structure and the bottom deck of the parking structured being located below grade. The proposed driveway entrance to the site will remain unchanged for where it is located today. Patrons will enter the site onto the top deck of the parking deck where there will be 28 parking spaces and an area for drop off and pick up. An additional 73 parking spaces will be located on the lower level of the parking deck beneath the hotel. The total number of parking spaces provided is 101 spaces at a ratio of 0.74 spaces per room.

 

BACKGROUNDThe Planning and Zoning Board heard the rezoning request at the December 10, 2019 meeting and recommended approval with staff conditions by vote of 7-0.

 

RECOMMENDATION/REQUESTED ACTIONCommunity Development recommends approval of the rezoning from OI to TS-Conditional for a proposed seven-story, 136 room boutique hotel with the following conditions:

 

Standard Conditions

(Requirement #2, 3, 4, 8, 9, 10, 11, 16 and 17 from Section 1201 of the Zoning Code is not applicable) 

 

1.                     The composition of the homes in a residential subdivision shall include a mixture of elements including; but not limited to: brick, stone, shake, hardy plank and stucco. No elevation shall be comprised of 100 percent hardy                      plank siding. The residences along external roadways shall not be permitted to utilize hardy plank for any elevation facing these roads.

 

2.                     The retention pond shall be placed and screened appropriately to be unobtrusive to homes inside and outside the development. The storm water detention plan shall be designed to create at least a ten percent reduction in                      a 100-year storm event. The city engineer shall approve all plans.

3.                     All utilities within the development shall be underground.

4.                     The developer shall be responsible for any traffic improvements (including additional right-of-way dedications) deemed necessary by either the city or the county during construction plan review. Sidewalks shall be provided                      by the developer inside the subdivision and outside the subdivision adjacent to any public right-of-way consistent with city's requirements for the extent of the development. A grass buffer with a minimum width of two inches                      shall be provided between the back of curb and sidewalk.

5.                     No debris may be buried on any lot or common area. 

6.                     The developer will comply with the city's current tree ordinance. All required tree protection measures shall be adhered to by the developer during construction.

7.                     All landscape plans must be prepared, stamped, and signed by a Georgia Registered Landscape Architect for any common areas or entrances. There shall be a landscaped front entrance, with monument, indicating the                      name of the development.

8.                     All yards and common areas are to be sodded, and landscaped. Irrigate as appropriate.

Special Conditions

 

9.                     The development shall maintain the following setbacks:

 

                     Front - 31’ (from the existing Right-of-way)

                     Side - 5’

                     Rear - 7’

 

10.                     The developer shall be responsible for any water and sanitary sewer improvements deemed necessary by the Public Works Director or Cobb County Water System during construction plan review.

 

11.                     The developer shall be responsible for any fire access improvements deemed necessary by the Fire Marshal during construction plan review. 

 

12.                     Trees shall be planted the entire length of Spring Hill Parkway at an average spacing of no more than 40’.

 

13.                     The proposed dumpster shall be located at the rear of the property and screened from the public right-of-way.

 

14.                     The development shall be limited to one access point on Spring Hill Parkway.

 

15.                     The development shall be allowed two wall signs (one sign on the Spring Hill Parkway elevation and one sign on the I-285 elevation) with a maximum allowable sign area of 125 sq. ft. for each sign.

 

16.                     All trees within the limits of disturbance and not located within a tree protection area must be removed during the land clearing and grading phase of the development.

 

17.                     Approval of the subject property for the TS zoning district shall be conditioned upon the development of the property in substantial compliance with the site plan submitted 11/9/2018 created by Kimley Horn and all zoning                      stipulations above.

 

18.                     The applicant shall be bound to the elevations submitted and dated 11/9/2018. Approval of any change to the elevations must be obtained from the Director of Community Development.

 

19.                     The additional stipulations agreed upon by the applicant in the letter submitted and dated on December 4, 2018. If there should be a discrepancy between the stipulations in the December 4, 2018 letter and the stipulations                      stated above, the stipulations stated above shall apply.